Leading manufacturer and supplier of ready mix concrete, liquid screed and concrete pumps for the South West
  • Concrete that meets British Standards
  • Expert advice on the mix required and volume
  • Delivered when you want it
  • Request a quote

Concrete services

 

At Wright Minimix, we provide a full range of concrete services, including liquid screed, ready mix concrete and concrete pumps for hire. Whether you are planning a DIY project and require a quality concrete mix delivered straight to your door, or require the assistance of one of our boom pumps for a large-scale commercial project, our team can meet all your requirements.

To find out more about our concrete services or to discuss a free quote, don’t hesitate to contact our expert team today on 0117 958 2090.

Quality ready mix concrete

 

We have concrete plants located in Bristol, Avonmouth, Newport and Cheddar, ready to supply you with premium quality concrete mixes batched to your specifications. We don’t do unnecessary waste, which means you’ll receive the exact amount of ready mix concrete that your request.

Our concrete specialists can tailor a concrete mix that is specifically suited to your requirements and application. All our concrete mixes satisfy BS8500-2 British governing standards and all mixing is strictly overseen at our plants by experienced supervisors.

We are capable of delivering ready mix concrete within 25 miles of any one of our concrete plants. Contact us for more information on 0117 958 2090.

ready mix concrete delivery

ready mix concrete delivery

Wrightflow liquid screed

 

Our specially developed Wrightflow liquid screed is designed to provide maximum effectiveness when combined with underfloor heating and is quick and easy to install in interior areas thanks to its flowability.

Liquid screed is totally self-levelling and we’ve included anti-crack fibres and anti-shrink agent to improve durability and reduce the risk of plastic shrinkage. Contact us today for a free quote on liquid screed. We are capable of delivering liquid screed within 30 miles of our concrete plants in Bristol, Newport and Cheddar.

liquid screed delivery

liquid screed

Concrete pumps for hire

 

Using a concrete pump is a worthwhile decision if you need concrete delivered efficiently in a short time frame or your site has access issues. Using a concrete pump can not only save you time but manual labour costs on big concreting jobs, as transporting large batches of concrete by hand in the required time frame can be a costly challenge.

We have a large fleet of both concrete boom pumps and boomless minipumps at our disposal that are available for hire with an experienced driver and operator. Our concrete pumps can make concrete delivery to even the most difficult to access sites quick and easy. Don't hesitate to contact us to arrange a concrete pump for hire, our concrete pumps can travel to anywhere in England and Wales (bar The City of London), and we are happy to work alongside other concrete suppliers.

concrete pumping services

concrete pumps for hire

Concrete Service FAQs

 

We are your number one choice in the region for affordable concrete services in the region. Don't hesitate to contact us with your enquiries and feel free to use our handy volume calculator to find out how much ready mix concrete you will need for your project.

CAN I CANCEL A DELIVERY ONCE PLACED?  

Yes, provided we have not batched the concrete already. Generally, cancellations less than 2 hours before delivery may not be possible due to the above.

HOW LONG DO I HAVE BEFORE THE CONCRETE SETS?  

Once the concrete arrives on site, you will normally have between 1 and 2 hours to place, level, compact and finish the concrete.

WHAT AM I RESPONSIBLE FOR IF I PLACE AN ORDER FOR A CONCRETE PUMP?  

You should ensure that the (agreed) area for the pump is accessible and clear for set up and access for the mixers. If possible, provide a bag of cement for grouting the line (otherwise we can provide another product at a small charge).

It is your responsibility to wash out the hopper of the pump after finishing the pour, then you must provide a box 1.5m by 1.5m by 0.3m high lined with plastic that we can use. The waste is your responsibility to move and dispose of.

We are the right people for you – let’s work together!
Contact us on 0117 958 2090 today to get a quote or to find out more.

 

We offer concrete services in Bristol, Cheddar, Newport, Avonmouth, Bath, Frome, Weston-super-Mare, Chippenham and Glastonbury.

News
How To Successfully Install A Concrete Shed Base
01st June 2020

Whether it’s for storing tools and gardening equipment or to turn into something a little more fun, a shed is a fantastic addition to any garden. So, if you’re looking to add a shed to your outside space, you’ll need to make sure it has a solid foundation to ensure its longevity and durability which is why we’ve put together this quick guide to installing the perfect concrete shed base.

1) Where will your shed go?

The first thing you’ll need to decide for a successful concrete shed base is where you want the structure to go in your garden. If it’s placed too near a wall it will be difficult to apply your wood treatment and finish and it might restrict your access. Don’t forget if it’s too close to a tree or large plant, the roots may affect the stability of the shed base.

2) Preparing the sub base

Once you’ve decided on your perfect location, it’s time to prepare the ground by:

  • Digging the top layer of soil down to at least a 3 inch depth
  • Constructing a wooden framework that runs the perimeter of the shed base and sit approximately 3 inches above garden level
  • Laying around 3 inches of compacted hardcore (brick rubble is also suitable) and if appropriate, compacted sand.

3) Pouring the concrete

Now you have prepared the ground, all you have to do is sit back and relax as the experts at Wright Minimix prepare the perfect concrete mix for you and deliver it straight to your home. By choosing ready mix concrete, you ensure the concrete you use for your shed base is correct, you order the exact amount you need to reduce waste and ensure you only pay for what you need.


To find out more about Wright Minimix’s DIY concrete manufacturing and delivery, please don’t hesitate to get in touch today on 0117 958 2090

Read more
What is reinforced concrete?
19th May 2020

Reinforced concrete is concrete that has steel bars embedded within it. The two materials then act harmoniously to absorb the tensile, compressive and shear forces acting upon it.

Why is concrete reinforcement necessary?

Solid concrete has incredibly high compressive strength. This means that it can cope with large amounts of pressure applied to its surface without breaking. In comparison, concrete’s tensile strength is usually less than 10% of its compressive strength, which makes it vulnerable to forces that could pull it apart, like earthquakes, vibrations and high winds. Steel rebar absorbs tensile stress applied to the concrete and significantly increases its ability to withstand it.

How does concrete reinforcement work? 

When embedded within concrete, steel bars, rods or mesh form a strong bond with the mix as it cures to create what is essentially a single structure. The steel is arranged in such a way to ensure maximum effectiveness in overcoming tensile forces, whilst the concrete makes up for the compressive strength that the steel bar lacks.

Do I need reinforced concrete for my project?

One question that we get asked frequently is if they will require a reinforced concrete slab for their project. Generally, reinforced concrete is recommended for all commercial applications. For DIY projects, it depends on both how large the concrete slab will be and its intended use. If you want to erect a small wooden shed, it shouldn’t be necessary, though you may want to consider steel reinforcement for a large driveway to avoid cracking.


We are proud to be your one stop shop for all things concrete in Bristol, South Wales and the surrounding areas. Whether you are working on a commercial contract or a job in the garden, we can deliver quality concrete mixes straight to you on site. We can even arrange steel reinforcement on your behalf as well. Call us today on 0117 958 2090.

Read more
Why liquid screed trumps dry screed indoors
17th April 2020

At Wright Minimix, our concreting experts maintain that liquid screed is far better than traditional dry screeds when it comes to indoor applications. Read on to find out why.

Speed of installation

Liquid screed will always be faster to install than dry screed. This is because it requires zero spreading or levelling. All you need is a concrete pump and a very limited number of tools to carry out installation. The larger the area you need to cover, the more time (and therefore cost) savings you will make by using liquid screed over a traditional dry screed.

Drying times

Our Wrightflow liquid screed has been specially designed to be quick drying whilst maintaining minimal chance of cracking. This means that your floor could be walked on within 24 hours and is usually capable of full weight bearing within 7 days. This is more rapid than the majority of traditional screeds.

Efficiency with underfloor heating

One of the most compelling reasons to choose liquid screed over a traditional dry screed is its improved thermal efficiency when combined with underfloor heating. This is because liquid screed wraps around the underfloor heating pipes completely and has minimal air pockets that prevents heat distribution throughout the floor. Better thermal efficiency means that you will have to spend less overall on other heating costs to compensate, like turning on radiators.


At Wright Minimix, we have created our own brand of Wrightflow liquid screed to ensure you get the best possible results. To find out more and arrange a quote, contact our team today on 0117 958 2090.

Read more
Concrete Curing – How To Do It & What To Avoid
07th April 2020

Why is curing concrete correctly important?

Curing (or drying time) is a very important stage during installation, as this is when concrete develops its strength and durability through hydration. However, curing concrete correctly is a delicate process and means controlling the amount and rate of moisture that is lost through evaporation to ensure optimal results. 

For example, a well-mixed batch of concrete can be made weaker by poor curing, whilst an average slump that is well cured can produce better durability. It is therefore extremely important for the longevity of your concrete that you follow the correct procedure when curing freshly laid concrete.

Do’s & Dont’s of curing concrete

 

Do's

 

Water Curing

The first 7-10 days are essential in the curing process, as this is when the concrete will increase in strength the most. During this period, it is essential that your concrete slab does not dry out, especially if it is in direct sunlight. Misting is a technique frequently used and involves spraying a fine mist of water regularly across the surface of the slab to maintain moisture levels and keep the surface damp at all times.

Cover your slab

If it is not realistic for you to employ the misting technique frequently, then covering your concrete slab with a plastic sheet is the most efficient way to prevent surface water from evaporating. When covering your concrete slab, make sure that the sheet extends beyond the edges of the slab by at least double the depth of the slab. Use bricks, rocks or other heavy items to hold the sheet in place. Remove the sheet daily, wet the concrete, and repeat for at least 7 days.

Don'ts:

Let your concrete get too hot or cold

The ideal temperature to pour concrete is between 10-15°C. If your freshly laid concrete becomes too cold, then the chemical reactions will also slow down. Your concrete therefore won’t gain strength as quickly (if at all if it’s very cold). Concrete insulating blankets should then be used for the first 2-3 days to avoid damage. If you expect the temperature to be higher than 23°C, it is especially important to ensure that that slab does not dry out too fast – keep it hydrated!

Put too much weight on it too soon

Wait at least 24 hours before allowing light foot traffic on your concrete slab and at least 10 days before heavy traffic, like cars, machinery and heavy furniture.


To arrange your competitive quotation for the best ready mix concrete in the South and South Wales, contact Wright Minimix today on 0117 958 2090 and we’ll be happy to help.

Read more